Case library 07 — Community platform

Softness as a design system.

A maternity community concept built to hold long-form editorial and peer conversation without the pull of an endless feed.

Type
Concept · self-directed
Discipline
Web · UI · Brand
Deliverables
Feed, community rooms, editorial studio, events
Duration
6 weeks
Softness as a design system.
01

The brief

Luna Bloom Society asked for a digital home that feels like a held breath: calm, luminous and intimate. Maternity platforms default to high-volume social mechanics, and the brief ruled those out from the start.

The problem was structural rather than visual — how to run a community without infinite scroll, open comment threads or engagement counters, and still give members a reason to return.

02

Design decisions

01

Stories arrive in small, complete sets. Ending the page is a feature: members leave calm rather than drained.

02

Open comment threads were replaced by small trimester rooms with a guide present, so conversation stays high-touch.

03

Long-form journal pieces lead the experience, so the brand earns trust before it asks for membership.

03

Outcome

A complete concept — feed, community rooms, editorial studio and events — expressed in one design language across twelve component families, ready to extend into a full product build.

What was delivered
12
Component families
Story, studio and event cards share one rhythm.
4
Core feed rituals
Each ritual is a complete, finite set.
6 wks
Concept to craft
Brief, visual language and interaction decisions.

A concept project designed in-house, not a client engagement. Figures describe the delivered design system — components, screens, scope and duration — not commercial results.

The concept is live and open to read.

The original build opens in a new tab, with its own case study page alongside it.

Open the live concept →
Next case
08 08 — Product launch Ion Forge X9 product launch system Read

Start with the two-week diagnostic.

A 60-minute review, then a fixed-fee fortnight. You leave with a costed roadmap and no obligation to continue.

Office
23A Dromorne Rd, Remuera
Auckland